Ask anyone who owns a villa in Jumeirah what they want to know before a renovation, and the first question is nearly always the same: how much will it cost? It is also the hardest question to answer over the phone. Two villas on the same street can need very different work, and two contractors can price the same villa in ways that look impossible to compare.
This guide does not pretend there is one number. It explains what actually moves the price, shows the planning ranges one Dubai renovation company publishes openly, and sets out how to read and compare itemised quotes so that the lowest total is not mistaken for the cheapest job. The figures come from Revive Hub Renovations Dubai, which publishes its planning ranges together with the scope each range assumes. They were read on 21 November 2026, and they are planning ranges, not quotes.
The short answer
- A whole-villa renovation is priced by scope, not by size alone. Revive Hub's published bands run from AED 65,000 to 135,000 for a light three-bedroom refresh to AED 300,000 to 600,000 and more for a major high-specification transformation.
- Kitchens and bathrooms carry much of the cost, because they combine plumbing, electrics, waterproofing and fitted joinery.
- Moving walls, adding services or choosing premium finishes moves a project into a higher band, sometimes more than the number of rooms does.
- The measured, written scope sets the real price. Budget separately for VAT, authority fees and deposits, and a reserve for what is found when walls are opened.
- Compare quotes line by line. The same room list, quantities, named materials, exclusions and payment stages, or the comparison means little.
Why Jumeirah renovations vary so much
Jumeirah is a coastal residential area of Dubai made up mainly of low-rise private homes, with large detached villas alongside more modest townhouses built in a variety of architectural styles. That variety is exactly why a single price per square metre tells a homeowner so little. A villa with a sound structure that needs new finishes is a different project from one where the kitchen moves, the bathrooms are stripped back to the slab and the cooling is redesigned.
The name also covers more than one place. Palm Jumeirah, Jumeirah Islands and Jumeirah Park are separate communities, each with its own management and its own rules for contractors and approvals. If your quote mentions a community route, check that it is the one your property actually sits under.
What drives the cost
1. How much of the house changes
The biggest single factor is scope. Revive Hub's villa page sets out four planning bands and, usefully, what each one covers:
| Planning scenario | What it typically includes | Revive Hub planning band |
|---|---|---|
| Light 3-bedroom refresh | Painting, selected repairs, one wet area or limited electrical work; no major structure | AED 65,000–135,000 |
| 3–4 bedroom family standard | Kitchen, two or three bathrooms, repainting, lighting and selected wardrobes | AED 95,000–200,000 |
| 4–5 bedroom premium renovation | Wider kitchen and bathroom work, feature finishes, multiple rooms, custom joinery | AED 140,000–300,000+ |
| 5+ bedroom major transformation | Bespoke joinery, premium stone, pool or landscape interfaces, smart systems or structural changes | AED 300,000–600,000+ |
The company is explicit that these are initial planning ranges and that a measured scope determines the written quotation. Read them as a way to place your project, not as a price.
2. Kitchens and bathrooms
Wet areas and kitchens concentrate trades in a small space. For kitchens, Revive Hub's planning bands run from AED 12,000–20,000 for a targeted refresh (new fronts, hardware, a worktop or backsplash) to AED 40,000–65,000 for a full replacement and AED 65,000–100,000 and more for bespoke kitchens; an open-plan conversion is priced project by project. For bathrooms, its range for a full renovation is generally AED 15,000–35,000, with smaller refreshes from around AED 8,000 and complex master bathrooms above AED 45,000.
What sits inside those numbers matters as much as the numbers. Its typical bathroom package lists a controlled strip-out, waterproofing and a 24-hour flood test before the tiles go on. A cheaper bathroom quote that leaves out the waterproofing method or the test is not cheaper; it is a different job.
3. Layout and structure
Keeping the layout is the cheapest option. In Revive Hub's online calculator, minor layout changes add 10% to the planning range and major structural changes add 20%. Structural work also brings its own requirements: an appropriately licensed engineer, drawings and, where the scope triggers it, a Dubai Municipality permit. None of that should be left to "we will sort it out later".
4. Building services
Cooling, electrics, plumbing and smart-home wiring are the parts of a renovation you stop seeing once the walls are closed, which is why they are easy to underestimate. The same calculator treats a new AC upgrade as a 12% add-on, new sanitary and plumbing as 10%, electrical and lighting work as 6% and smart automation as 20%. Work that changes the electrical load or metering can also need DEWA review.
5. Finish grade
The same villa can be renovated to different standards. For a medium four-to-five-bedroom villa with no extras and the same layout, Revive Hub's calculator gives AED 85,500–106,875 at economy grade, AED 121,500–151,875 at standard and AED 180,000–225,000 at premium. The gap between economy and premium is a reminder that the materials you choose can move the budget as much as the rooms you include.
6. Living in the villa during the work
Some families prefer to stay at home. That is often possible, but it costs time and money: work has to be phased, rooms protected and hours agreed. The calculator lists occupied-property phasing as a 10% add-on and restricted access hours as 12%. Whatever the contractor promises about dust, cutting and demolition still produce it inside the work zone, so agree safe areas, working hours and any temporary move in writing.
7. Approvals, fees and the unknowns
Three further costs sit outside most headline figures:
- Approvals. Depending on the property and the work, a renovation can need permission from the community or developer, a Dubai Municipality permit and DEWA review; a tenanted villa needs the owner's written consent. The fees and deposits are separate costs, and your quote should say who prepares and submits each one.
- Hidden conditions. Revive Hub's calculator lists hidden MEP repairs discovered after opening walls among the common extras it does not include. The more walls and floors a renovation opens, the more room there is for surprises.
- Reserve and VAT. The calculator uses a 10% planning reserve as its worked-example starting point (not a charge) and adds the applicable 5% VAT separately.
For a step-by-step way to build those items into a budget, see our guide to budgeting a renovation.
How to compare itemised quotes
A quote is only comparable to another quote if both describe the same work. Revive Hub's own advice is to compare the same room list, quantities, brands, models, exclusions, approvals, testing, milestones and programme, and it adds a point worth remembering: a lower lump sum is not a like-for-like saving when important lines are provisional or missing.
Before you put two quotes side by side, make sure each one covers the same five documents in some form: the room-by-room scope, the specifications, a points plan for electrics, plumbing, AC and appliances, the payment and variation terms, and the warranty and handover terms. Then go through them line by line.
| Check | What to look for | Why it matters |
|---|---|---|
| Quantities | A quantity against every material line: square metres of tile and paint, metres of cabinets, number of fittings | Without quantities, the price can grow later without anything visibly changing |
| Named materials | A brand, model, size and finish, or a stated allowance | "Standard" or "equivalent" can mean a cheaper product on site |
| Labour | Labour shown by trade rather than one lump sum | You can see what each part of the job costs |
| Provisional amounts | Which lines are not fixed, and why | Provisional sums are where totals drift |
| Approvals | Who checks the requirements, submits and pays each fee | "All approvals included" with no breakdown is hard to hold anyone to |
| Exclusions | Appliances, loose furniture, external work, hidden-condition repairs | What is excluded from one quote may be included in the other |
| Payments | Stages tied to measurable work, not calendar dates | You pay for progress you can see |
| Variations | A written procedure with the price and time effect before the work starts | Verbal changes are the usual source of disputes |
| Warranty | Workmanship cover, its duration and exclusions, and manufacturer warranties | A verbal warranty is difficult to rely on later |
| Programme | When approvals, ordering and long-lead items happen | A start date means little if the approvals are not in place |
Two warning signs deserve special attention because they are easy to miss: a large advance with no procurement list or milestone behind it, and a business name, bank account and contract entity that do not match. Our guides to comparing contractor quotes line by line, paying a contractor in stages and controlling change orders go further into each of these.
If you already hold a quote and want a second opinion, Revive Hub offers a free review of any contractor's quotation: you upload it and receive an automatically generated PDF covering the scope, materials, approvals, variations, payments and warranty wording, with no obligation to use the company. It is a second opinion on the document, not engineering or legal advice, but it is a quick way to find the questions worth asking.
Seeing the design before paying for the work
Changes of mind are expensive once work has started: a kitchen island that turns out to be in the way, a tile that looks different on a whole wall, a bathroom layout that only makes sense once it is built. A change is cheapest before anything is ordered or demolished.
That is the thinking behind Revive Hub's First See Then Pay approach. Prospective clients who send enough usable photos, dimensions or plans receive a free initial 3D concept before they approve any paid renovation scope, with the first round of revisions included and no obligation to hire the company afterwards. Its target is 24 hours for an apartment or a single room and 24 to 48 hours for a villa with several areas. The company is careful to say what this does not cover: measurements, detailed drawings, approvals, materials and the construction itself belong to the paid scope that follows, and construction payments then follow the milestones in the signed contract.
For a homeowner comparing quotes, a concept like this has a second use. It gives every contractor the same picture to price, which makes the quotes easier to compare.
A budgeting sequence for a Jumeirah renovation
- List the rooms and the reasons. What must change, what would be nice to change, and whether the family will stay in the villa during the work.
- Collect photos and a plan. Wide photos of each room and any floor plan you have; they are what any designer or estimator starts from.
- Place the project in a band. Use published planning ranges, such as the ones above, to see roughly where your scope sits. Revive Hub's renovation cost calculator does this for 18 project types: choose the type, size and finish, add the extras that apply, and it shows a planning range on the page, with the reserve and VAT as separate settings, without asking for your contact details.
- Ask for a measured, itemised scope. Room by room, with quantities, named materials and exclusions.
- Add the costs outside the quote. VAT, authority fees and deposits, and a reserve for hidden conditions.
- Compare quotes line by line, using the checks above, and ask each contractor about every gap.
- Fix payments and variations in writing before anything is ordered.
Where Revive Hub fits
Revive Hub Renovations Dubai is the trading name of Revive Hub Technical Services LLC, which holds Dubai trade licence 1560163 and renovates villas, apartments and offices across Dubai. Its founder, Jamshed Ahmed, has more than 14 years of renovation work in Dubai, and the company counts more than 700 projects by its team since 2014, including work done before Revive Hub was founded. Its project walkthroughs include a waterfront villa on Palm Jumeirah and a family villa on Jumeirah Islands.
What sets its approach apart is the order of things: the 3D concept first, then an itemised written scope, then the paid work. If you are planning a renovation in Jumeirah, you can start with Revive Hub's free initial 3D concept and itemised renovation quote, or use its quote review to check a quotation you already have.
Questions people ask
Is a renovation cheaper if we move out?
Often a little. Phasing the work around a family takes longer and needs more protection; Revive Hub's calculator adds 10% for occupied-property phasing. Weigh that against the cost of renting elsewhere for the duration.
Do I need approval to renovate a villa in Jumeirah?
It depends on the property and the work. Cosmetic work and structural changes are treated very differently; the layers to check are the community or developer, Dubai Municipality where the scope triggers a permit, DEWA for load or metering changes, and the owner's consent for a tenanted villa.
How much should I keep in reserve?
Revive Hub's calculator uses 10% as its worked-example starting point for a planning reserve. Any work that opens walls or floors argues for keeping it.
Why are two quotes for the same villa so far apart?
Usually because they do not describe the same job. One may include waterproofing tests, approvals and named materials that the other leaves out or marks as provisional. Put both on the same room list and the same specifications before deciding which is cheaper.